SOUTH Projects

Home > SOUTH Projects
S# ADP Scheme Code Name of Scheme Completion Date Details
1 1495 200327 CONSTRUCTION OF ROAD CONNECTING SUB-DIVISION WAZIR TO BANNU CIRCULAR ROAD BANNU.Total length (43 Km). Sep, 2025 Details
2 1274 180163 CONSTRUCTION OF ROAD FROM KRAPA TO SHAKARDARA DISTRICT KOHAT (LENGTH = 31.744 KM) june 30 2026 Details
3 1496 220638 Feasibility Study, Detailed Engineering Design and construction of dualization of road from Indus Highway to Bannu City (26-KM)PDWP 31-10-2022. june 30 2026 Details
4 1271 170523 F/S & CONSTRUCTION OF CIRCULAR BYPASS ROAD, BANNU Total length = 41 Km Aug 30 2026 Details