Swat Expressway (Phase - I)

 

SALIENT FEATURES (SEW-I)

  1. Alignment                                 :  New
  2. Project Length                         :  81 Kilometers (fenced)
  3. Right of Way                             :  80 Meter (approx. 265ft)
  4. No. of Lanes                              :  4 Lanes 
  5. Design Speed                           :  120Km/hr
  6. Future Planning                       :  Addition of 2 lanes on outer side
  7. Shoulder width (Treated)        :  Outer – 3 meter & Inner – 1 meter
  8. Interchanges                            :  07 Nos.
  9. Major Structures                     :  25 No. of Bridges
  10. Tunnel                                      :  Malakand Range 3 No. Twin Tube
  11. Project Cost                             :  Rs 34.165 Billion 
  12. Land Cost                                :  Rs 6.8 Billion 
  13. Average Daily Traffic              :  18,000 ADT
 
  
 
  
 

 

Swat Expressway (Phase - II)

 

 

SALIENT FEATURES (SEW-II)

 

  1. Alignment                                       : New
  2. Project Length                               : 80 Kilometers (fenced)
  3. Right of Way                                  : 50~55 Meter (approx. 165ft)
  4. No. of Lanes                                   : 4 Lanes extendable to 6 Lanes
  5. Design Speed                                 : 120Km/hr
  6.  Future Planning                            : Addition of 2 outer lanes
  7. Central Median                              : New Jersey Barrier (NJB)
  8. Shoulder width (Treated)            : Outer – 3 meter & Inner – 1 meter
  9. Interchanges                                 : 09 Nos.
  10. Main Bridges on River Swat        : 8 Nos 
  11. Cost of Land & Re-Settlement     : Rs 21.5     Billion
  12. Construction Cost (NHA CSR)      : Rs 36.404 Billion