Swat Expressway (Phase - I)
SALIENT FEATURES (SEW-I)
-
Alignment : New
-
Project Length : 81 Kilometers (fenced)
-
Right of Way : 80 Meter (approx. 265ft)
-
No. of Lanes : 4 Lanes
-
Design Speed : 120Km/hr
-
Future Planning : Addition of 2 lanes on outer side
-
Shoulder width (Treated) : Outer – 3 meter & Inner – 1 meter
-
Interchanges : 07 Nos.
-
Major Structures : 25 No. of Bridges
-
Tunnel : Malakand Range 3 No. Twin Tube
-
Project Cost : Rs 34.165 Billion
-
Land Cost : Rs 6.8 Billion
-
Average Daily Traffic : 18,000 ADT
Swat Expressway (Phase - II)
SALIENT FEATURES (SEW-II)
-
Alignment : New
-
Project Length : 80 Kilometers (fenced)
-
Right of Way : 50~55 Meter (approx. 165ft)
-
No. of Lanes : 4 Lanes extendable to 6 Lanes
-
Design Speed : 120Km/hr
-
Future Planning : Addition of 2 outer lanes
-
Central Median : New Jersey Barrier (NJB)
-
Shoulder width (Treated) : Outer – 3 meter & Inner – 1 meter
-
Interchanges : 09 Nos.
-
Main Bridges on River Swat : 8 Nos
-
Cost of Land & Re-Settlement : Rs 21.5 Billion
-
Construction Cost (NHA CSR) : Rs 36.404 Billion
F/S and detailed design of Peshawar - D.I.Khan Motorway. (320 Km).
SALIENT FEATURES
Alignment : New
Project Length : 365 Kilometers (fenced)
Right of Way : 100 Meter
No. of Lanes : 6 Lanes (3X3)
Design Speed : 120Km/hr (Plain): : 60Km/hr (Hilly)
Interchanges : 19 Nos.
Tunnels : 02 Nos Twin Tubes
1. Dara Adam Khel 5.62 Km.
2. Banda Dawood Shah 1.42 Km
Tunnel Lanes : 2 Lanes in Each Direction
Central Median : New Jersey Barrier
No. of Interchanges : 19 Nos.
Dir Motorway