CONSTRUCTION OF ROAD FROM KRAPA TO SHAKARDARA DISTRICT KOHAT (LENGTH = 31.744 KM)

Name of the Project : IMPROVEMENT & REHABILITATION OF ROAD FROM KRAPA TO SHAKARDARA (31.744 KM) DISTRICT KOHAT ADP#1546/180163 (2022-2023).
PC-1 Cost : Rs. 2,266.33 Million.
B.O.Q Cost : Rs. 1,797.064 Million.
Revised Cost (Civil Works) : Rs. 1,698.015 Million
Revised Cost (Total Works) : Rs. 2,492.712 Million
Up to Date Expenditure : Rs. 1,297.033 Million.
Date of Commencement : P-I, 24/01/2019, P-II, 20/12/2018, P-III, 03/12/2018.
Original Date of Completion : P-I, 23/07/2021, P-II, 19/06/2021, P-III, 02/06/2021.
Revised Date of Completion : 30/06/2023
Executing Agency : Pakhtunkhwa Highways Authority (PKHA).
Design Consultant : Creative Engineering Consultant (CEC).
Supervisory Consultant : M/S  NESPAK Ltd.
Contractors : (Package-01) M/S Fazal Karim & Co (Pvt) Ltd./Assigned to I.K.F Buraq Construction Company (Pvt) Ltd. : (Package-02) M/S Ghulam Muhammad Khan & Co/Assigned to Ali Associate.
Total Project Length 31.744 KM
Technical Standards              AASHTO/NHA Specification
Pavement Type                      Flexible       
ROW Width (Normal)          18.28 m 
Formation Width 11.30 m
Pavement Width             7.30 m 
Shoulder’s Width 2.00 m Permeable (each side)
Pavement Cross Slope 2%
Shoulder Cross Slope 4%
Design Speed for plain area 60 Km./Hr.
Design Speed for Hilly area 40 Km./Hr.
Design Speed for Sharp Hairpin bends 20 Km./Hr.
CARRIAGEWAY
AWC 05 cm
ABC       08 cm
WBM 25 cm
Granular Sub Base Course 15 cm
Improved Sub Grade Trenches (Widening) 30 cm to 45 cm
SHOULDERS 
Permeable Shoulders 38 cm 
PCC Shoulders (Saucer Drain) 15 cm
Granular Sub Base Course    15 cm
BRIDGES
P-1, RCC Bridge At Km 11+350 25 m Length (Single Sp