south Project

Home > Projects > SOUTH

Feasibility Study, Detailed Engineering Design and construction of dualization of road from Indus Highway to Bannu City (26-KM)PDWP 31-10-2022.

220638 - Feasibility Study, Detailed Engineering Design and construction of dualization of road from Indus Highway to Bannu City (26-KM)PDWP 31-10-2022.