Dualization of Road from Katlang to Bazar Doran Abad Chowk (Chungi) Mardan 19.675 KM (ADP # (1619/190566/2020-21)
The Project is located in District Mardan, The zero point is starting from Katlang Chungi (Mardan Swabi Road) and end point is Matta Bridge Main Irrigation Canal. The Road is passing through Shankar Bazar, Jamal Gari, Parash main stop of Kati Gari as well as Main Katlang Bazar. The Project road total length is 19.675 KM. The Project road is a access road to Babozi Inter Change of Swat Motor Way. The People which came from swat or from Peshawar Islamabad is using as entry road to Katlang Bazar and other surrounding Villages. The Project road have an important role in the development of the Tehsil Katlang. The Project road will give a role in the development of Business between Swat and Mardan. The Project is physically 31.52% Completed,