F/S / D & Recon: of Bridges: Arsala(40 meter),Aghan Pur (20 meter),Drwaza Kas(30 meter),Doghi(25 meter), Khyali (225 meter), Matra(35 meter),Machni (120 meter),Kababian (12 meter),Gwalerai (70 meter,Aloch Puran(30 meter),Chena on Swari- Ambla rd
A.A. with Date = 1990.727 (27-07-2020)
T.S. with Date = 53.477 (22-05-2023)
PDWP = 26/06/2020.
PACKAGE - I Arsala Bridge (S-11) (40 meter)
PACKAGE - II
Khyali Bridge (S–1)
Contract Cost = 476.130 M
Bid Cost = 421.797 m
Up to date payment = 33.987 M
PACKAGE - III
Matra Bridge (S–4)
Machni Bridge (S–4)
Kababian Bridge (S–4)
Contract Cost = 438.00 M
Bid Cost = 396.292 M
Up to date payment = 15.014 M
PACKAGE - IV:
Anghapur Bridge (S-10) (20 meter) Buner
Bid Cost=132.544
V.O-I= 103.608
Aloch Bridge (S-10-A) (30 meter)
Bid Cost=159.819
V.O-I= 150.705
Cheena Bridge (S-10-A) (40 meter)
Bid Cost=115.642
V.O-I= 79.882
PACKAGE - V:
Gwalerai Bridge (S-10-A) (70 meter)
Bid Cost=160.151
V.O-I = 165.588
Uptoa date Payment = 80.022
PACKAGE - VII:
Drwaza Kas Bridge BN Road (30 meter)
Bid Cost = 123.882 M
Doghi Bridge Oghi Darband Road (25 meter)
Bid Cost = 110.834 M