F/S , Design and Construction of Grade separated intersection at Shaheed Chowk Timergara (800 Meter).

Total Cost  = 1411.377

Expenditure to the end of previous year = 50.00
30/06/2024
PDWP - 31-10-2022
Total Cost: Rs. 1411.377 M
AA 06-12-2022
Design Consultant: M/s NESPAK on 20-12-2021
Supervisory Consultant: M/s NESPAK on 15-07-2022