Construction

Completed
S.No Name of Scheme Length (KM)
     
1 Re-construction of Garhi Habibullah – Bararkot road. 6.00
2 Construction of Link road from Bannu Township to Indus Highway 26.00
3 Construction of left carriageway from Takhtbhai to Jalala (NCC road) 5.00
4 Construction of Timergara Bypass Road 3.00
5 Construction of Khazana Bypass Road 2.00
6 Construction of Hangu Bypass Road 6.00
7  Construction of road from Mayyar to Asmaar District Lower Dir 25.50
8 Construction of Mardan-Swabi Bypass road 17.00
9 Construction of Mardan Western Bypass road 16.00
10 Construction of Chukiatan to Barawal road Distric Upper Dir 17.00
11 Construction of  Bezan Khel Umerzai road  11.00
12 Construction of road along Distributory No.6 Nisatta Branch & Khan Mahi Branch in District Charsadda  27.00
13 Construction of Mingora Bypass road District Swat 5.00
14 Construction of Link road from indus Highway to Lakki via Manjewala Paharkhel 19.00
  TOTAL 185.5 KM
In Progress
S.No Name of Scheme Length (KM)
     
1 Construction of alternate route from Malakand District to down District. (Swat Express Way) (Phase-I) 91.00
2 Construction of Road From Chukyatan to Sheringal Patrak (Dir Upper) 36.00
3 Construction of Road from Wali Interchange to Toru  9.00
4 Construction of Mardan North Bypass Road 13.50
5 Construction of Service Roads along with fencing on both sides of Eastern & Western bypass on N-45 and Charsadda Road 57.00
6 Construction & Remodling of Southern Bypass Detouring Hayatabad (NAS Assisted ) 26.00
7 Construction of Link between N-45 & Sheringal Road  2.10
     
  TOTAL 234.60 KM

   
KP Portal
NHA
KP PSC
   

Enter E-mail: